106 citations to https://www.mathnet.ru/rus/tvp4740
  1. FREDERICK S. HILLIER, KUT C. SO, “The effect of machine breakdowns and interstage storage on the performance of production line systems”, International Journal of Production Research, 29:10 (1991), 2043  crossref
  2. MARIA DI MASCOLO, RENE DAVID, YVES DALLERY, “Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers”, IIE Transactions, 23:4 (1991), 315  crossref
  3. G. ACHARD, J. M. PROTH, “Fast evaluation of an unreliable transfer line with limited transportation devices”, International Journal of Production Research, 28:2 (1990), 301  crossref
  4. J. M. Proth, H. P. Hillion, Mathematical Tools in Production Management, 1990, 363  crossref
  5. S.M. Meerkov, F. Top, “Asymptotically Reliable Serial Production Lines: Analysis, Synthesis and a Case Study”, IFAC Proceedings Volumes, 23:8 (1990), 21  crossref
  6. Xiao-Gao Liu, John A. Buzacott, “Approximate models of assembly systems with finite inventory banks”, European Journal of Operational Research, 45:2-3 (1990), 143  crossref
  7. O.L. Iliev, G.M. Dimirovski, N.E. Gough, R.M. Henry, B.R. Percinkova, 2, Proceedings of the IEEE International Workshop on Intelligent Motion Control, 1990, 871  crossref
  8. J.-T. Lim, S.M. Meerkov, F. Top, “Homogeneous, asymptotically reliable serial production lines: theory and a case study”, IEEE Trans. Automat. Contr., 35:5 (1990), 524  crossref
  9. J.-T. Lim, S.M. Meerkov, F. Top, Proceedings. ICCON IEEE International Conference on Control and Applications, 1989, 596  crossref
  10. J.-T. Lim, S.M. Meerkov, F. Top, Proceedings of the 28th IEEE Conference on Decision and Control, 1989, 60  crossref
Предыдущая
1
6
7
8
9
10
11
Следующая