33 citations to https://www.mathnet.ru/rus/at14336
  1. L. Xie, Ya. Chen, R. Chang, “Scheduling optimization of prefabricated construction projects by genetic algorithm”, Appl. Sci.-Basel, 11:12 (2021), 5531  crossref  isi
  2. Sönke Hartmann, Application of Mathematics and Optimization in Construction Project Management, 2021, 25  crossref
  3. R. Pellerin, N. Perrier, F. Berthaut, “A survey of hybrid metaheuristics for the resource-constrained project scheduling problem”, Eur. J. Oper. Res., 280:2-3 (2020), 395–416  crossref  mathscinet  isi
  4. A. Sh. Chaleshtarti, Sh. Shadrokh, M. Khakifirooz, M. Fathi, P. M. Pardalos, “A hybrid genetic and Lagrangian relaxation algorithm for resource-constrained project scheduling under nonrenewable resources”, Appl. Soft. Comput., 94 (2020), 106482  crossref  isi  scopus
  5. K. M. Sallam, R. K. Chakrabortty, M. J. Ryan, “A two-stage multi-operator differential evolution algorithm for solving resource constrained project scheduling problems”, Futur. Gener. Comp. Syst., 108 (2020), 432–444  crossref  isi
  6. Viacheslav Frolov, Olga Prikhodko, Sergey Slipchenko, “Calculation of the energy-efficient cutting modes in turning operation”, Energy Systems, 5:1 (2020), 228  crossref
  7. A S Antonova, K A Aksyonov, “Analysis of the methods for accounting the renewable and non-renewable resources in scheduling”, J. Phys.: Conf. Ser., 1694:1 (2020), 012005  crossref
  8. Ch. Jiang, X. Hu, J. Xi, “Integrated multi-project scheduling and hierarchical workforce allocation in the eto assembly process”, Appl. Sci.-Basel, 9:5 (2019), 885  crossref  isi  scopus
  9. Zh. You, Ch. Wu, “A framework for data-driven informatization of the construction company”, Adv. Eng. Inform., 39 (2019), 269–277  crossref  isi  scopus
  10. Xun Wang, Yao P., Zhang J., Wan Lujun, Jiao Zh., “Dynamic resource scheduling for C2 organizations based on multi-objective optimization”, IEEE Access, 7 (2019), 64614–64626  crossref  isi
Предыдущая
1
2
3
4
Следующая