- Sophie Weiss, Justus Arne Schwarz, Raik Stolletz, “The buffer allocation problem in production lines: Formulations, solution methods, and instances”, IISE Transactions, 51, № 5, 2019, 456
- Vahid Abbasgholi Pourghadim, M.Y. Noordin, Kuan Yew Wong, “Effect of Buffer Size Variation on Remanufacturing Environment”, AMR, 845, 2013, 755
- Mehmet Ulaş Koyuncuoğlu, Leyla Demir, “Buffer capacity allocation in unreliable production lines: An adaptive large neighborhood search approach”, Engineering Science and Technology, an International Journal, 24, № 2, 2021, 299
- A. Dolgui, A. Eremeev, M. Y. Kovalyov, V. Sigaev, “Complexity of Buffer Capacity Allocation Problems for Production Lines with Unreliable Machines”, J Math Model Algor, 12, № 2, 2013, 155
- Simge Yelkenci Köse, Leyla Demir, Semra Tunalı, Deniz Türsel Eliiyi, “Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industry”, Engineering Optimization, 47, № 2, 2015, 149
- Beixin Xia, Binghai Zhou, Ci Chen, Lifeng Xi, “A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers”, J Intell Manuf, 27, № 4, 2016, 765
- Leyla Demir, Semra Tunali, Deniz Tursel Eliiyi, “The state of the art on buffer allocation problem: a comprehensive survey”, J Intell Manuf, 25, № 3, 2014, 371
- Y. Massim, F. Yalaoui, E. Chatelet, A. Yalaoui, A. Zeblah, “Efficient immune algorithm for optimal allocations in series-parallel continuous manufacturing systems”, J Intell Manuf, 23, № 5, 2012, 1603
- Shaohui Xi, Qingxin Chen, James MacGregor Smith, Ning Mao, Ailin Yu, Huiyu Zhang, “A new method for solving buffer allocation problem in large unbalanced production lines”, International Journal of Production Research, 58, № 22, 2020, 6846
- Alexandre Dolgui, Anton Eremeev, Viatcheslav Sigaev, “On Local Optima Distribution in Buffer Allocation Problem for Production Line with Unreliable Machines”, IFAC-PapersOnLine, 55, № 10, 2022, 1092