58 citations to 10.1023/A:1016560109076 (Crossref Cited-By Service)
  1. Mehmet Ulaş Koyuncuoğlu, Leyla Demir, “A comparison of combat genetic and big bang–big crunch algorithms for solving the buffer allocation problem”, J Intell Manuf, 32, № 6, 2021, 1529  crossref
  2. Chun Su, Yangmei Shi, Jianping Dou, “Multi-objective optimization of buffer allocation for remanufacturing system based on TS-NSGAII hybrid algorithm”, Journal of Cleaner Production, 166, 2017, 756  crossref
  3. Öncü Hazır, Xavier Delorme, Alexandre Dolgui, “A Survey on Cost and Profit Oriented Assembly Line Balancing”, IFAC Proceedings Volumes, 47, № 3, 2014, 6159  crossref
  4. C.T. Papadopoulos, M.E.J. O’Kelly, A.K. Tsadiras, “A DSS for the buffer allocation of production lines based on a comparative evaluation of a set of search algorithms”, International Journal of Production Research, 51, № 14, 2013, 4175  crossref
  5. Amos H.C. Ng, Sabry Shaaban, Jacob Bernedixen, “Studying unbalanced workload and buffer allocation of production systems using multi-objective optimisation”, International Journal of Production Research, 55, № 24, 2017, 7435  crossref
  6. Chuan Shi, Stanley B. Gershwin, “A segmentation approach for solving buffer allocation problems in large production systems”, International Journal of Production Research, 54, № 20, 2016, 6121  crossref
  7. Öncü Hazır, Xavier Delorme, Alexandre Dolgui, “A review of cost and profit oriented line design and balancing problems and solution approaches”, Annual Reviews in Control, 40, 2015, 14  crossref
  8. Simge Yelkenci Kose, Ozcan Kilincci, “Hybrid approach for buffer allocation in open serial production lines”, Computers & Operations Research, 60, 2015, 67  crossref
  9. Christian Becker, Armin Scholl, “A survey on problems and methods in generalized assembly line balancing”, European Journal of Operational Research, 168, № 3, 2006, 694  crossref
  10. Fuli Xiong, Keyi Xing, “Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time”, International Journal of Production Research, 52, № 9, 2014, 2743  crossref
Предыдущая
1
2
3
4
5
6
Следующая