|
|
Publications in Math-Net.Ru |
Citations |
|
2017 |
1. |
V. I. Levin, “Modeling of combinatorial problems with the help of continuous logic”, Tambov University Reports. Series: Natural and Technical Sciences, 22:2 (2017), 439–448 |
2. |
V. I. Levin, “Dedetermination – method of some modeling problems’ solving”, Tambov University Reports. Series: Natural and Technical Sciences, 22:1 (2017), 23–32 |
|
2005 |
3. |
V. I. Levin, “Optimizing schedules in the pipeline systems with variable job execution order”, Avtomat. i Telemekh., 2005, no. 3, 74–90 ; Autom. Remote Control, 66:3 (2005), 406–421 |
4. |
V. I. Levin, “Ëîãè÷åñêîå ìîäåëèðîâàíèå ðàçðûâíûõ ôóíêöèé”, Probl. Upr., 2005, no. 4, 25–29 |
5. |
V. I. Levin, “Interval logic and superfuzzy sets”, Probl. Upr., 2005, no. 2, 40–43 |
|
2004 |
6. |
V. I. Levin, “Comparison of interval numbers and optimization of interval-parameter systems”, Avtomat. i Telemekh., 2004, no. 4, 133–142 ; Autom. Remote Control, 65:4 (2004), 625–633 |
11
|
|
2003 |
7. |
V. I. Levin, “Methods of Continuous Logic in Control”, Avtomat. i Telemekh., 2003, no. 3, 28–51 ; Autom. Remote Control, 64:3 (2003), 368–389 |
3
|
8. |
V. I. Levin, “Extending the Continuous Logic to Uncertain Variables”, Avtomat. i Telemekh., 2003, no. 2, 176–188 ; Autom. Remote Control, 64:2 (2003), 331–342 |
|
2002 |
9. |
V. I. Levin, “An M-Stage System with Indeterminate Processing Time: Schedule Optimization”, Avtomat. i Telemekh., 2002, no. 2, 129–136 ; Autom. Remote Control, 63:2 (2002), 289–295 |
1
|
10. |
V. I. Levin, “An M-Stage System with Indeterminate Processing Time. I. Schedule Optimization”, Avtomat. i Telemekh., 2002, no. 1, 116–124 ; Autom. Remote Control, 63:1 (2002), 103–110 |
1
|
|
2001 |
11. |
V. I. Levin, “Basic Generalizations of Continuous Logic”, Avtomat. i Telemekh., 2001, no. 10, 223–234 ; Autom. Remote Control, 62:10 (2001), 1743–1755 |
|
1999 |
12. |
V. I. Levin, “Automaton modeling of collective procedures”, Avtomat. i Telemekh., 1999, no. 12, 141–147 ; Autom. Remote Control, 60:12 (1999), 1791–1796 |
3
|
|
1996 |
13. |
V. I. Levin, I. Yu. Miretskii, “Optimal Task Scheduling in Conveyor Systems”, Avtomat. i Telemekh., 1996, no. 6, 3–30 ; Autom. Remote Control, 57:6 (1996), 773–793 |
2
|
14. |
V. I. Levin, “The 3-Bench Problem with Indefinite Operation Times”, Avtomat. i Telemekh., 1996, no. 1, 109–120 ; Autom. Remote Control, 57:1 (1996), 89–97 |
2
|
|
1995 |
15. |
V. I. Levin, “Scheduling optimization in systems with indefinite times of processing. II”, Avtomat. i Telemekh., 1995, no. 3, 106–116 ; Autom. Remote Control, 56:3 (1995), 394–400 |
1
|
16. |
V. I. Levin, “Scheduling optimization in systems with indefinite processing times. I”, Avtomat. i Telemekh., 1995, no. 2, 99–110 ; Autom. Remote Control, 56:2 (1995), 236–244 |
2
|
|
1994 |
17. |
V. I. Levin, “Boolean linear programming with interval coefficients”, Avtomat. i Telemekh., 1994, no. 7, 111–122 ; Autom. Remote Control, 55:7 (1994), 1019–1028 |
6
|
|
1992 |
18. |
V. I. Levin, “Discrete optimization under interval uncertainty”, Avtomat. i Telemekh., 1992, no. 7, 97–106 ; Autom. Remote Control, 53:7 (1992), 1039–1047 |
6
|
|
1987 |
19. |
V. I. Levin, “Optimizing the operation of $m$ machine tools with constrained part sequencing”, Avtomat. i Telemekh., 1987, no. 3, 107–116 |
|
Organisations |
|
|
|
|