|
|
Publications in Math-Net.Ru |
Citations |
|
2020 |
1. |
E. R. Gafarov, A. Lazarev, F. Werner, “Minimizing total weighted tardiness for scheduling equal-length jobs on a single machine”, Avtomat. i Telemekh., 2020, no. 5, 119–138 ; Autom. Remote Control, 81:5 (2020), 853–868 |
3
|
|
2016 |
2. |
E. R. Gafarov, “Graphical method to solve combinatorial optimization problems”, Avtomat. i Telemekh., 2016, no. 12, 26–36 ; Autom. Remote Control, 77:12 (2016), 2110–2117 |
3. |
E. R. Gafarov, A. Dolgui, A. A. Lazarev, F. Werner, “A new effective dynamic program for an investment optimization problem”, Avtomat. i Telemekh., 2016, no. 9, 150–166 ; Autom. Remote Control, 77:9 (2016), 1633–1648 |
2
|
|
2010 |
4. |
E. R. Gafarov, A. A. Lazarev, F. Werner, “Algorithms for some maximization scheduling problems on a single machine”, Avtomat. i Telemekh., 2010, no. 10, 63–79 ; Autom. Remote Control, 71:10 (2010), 2070–2084 |
5
|
|
2009 |
5. |
A. A. Lazarev, E. R. Gafarov, “Transformation of the network graph of scheduling problems with precedence constraints to a planar graph”, Dokl. Akad. Nauk, 424:1 (2009), 7–9 ; Dokl. Math., 79:1 (2009), 1–3 |
|
2008 |
6. |
A. A. Lazarev, E. R. Gafarov, “On project scheduling problem”, Avtomat. i Telemekh., 2008, no. 12, 86–104 ; Autom. Remote Control, 69:12 (2008), 2070–2087 |
2
|
|
Organisations |
|
|
|
|