Vestnik Yuzhno-Ural'skogo Universiteta. Seriya Matematicheskoe Modelirovanie i Programmirovanie
RUS  ENG    JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PACKAGE AMSBIB  
General information
Latest issue
Archive
Submit a manuscript

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Vestnik YuUrGU. Ser. Mat. Model. Progr.:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Vestnik Yuzhno-Ural'skogo Universiteta. Seriya Matematicheskoe Modelirovanie i Programmirovanie, 2019, Volume 12, Issue 3, Pages 5–16
DOI: https://doi.org/10.14529/mmp190301
(Mi vyuru500)
 

This article is cited in 4 scientific papers (total in 4 papers)

Mathematical Modelling

On time selection for track possession assignment at the railway station

A. N. Ignatov, A. V. Naumov

Moscow Aviation Institute, Moscow, Russian Federation
Full-text PDF (266 kB) Citations (4)
References:
Abstract: We consider the problem on track possession assignment at the railway station. The problem is to determine the time during which the train traffic is interrupted for repair works at several railway tracks. To this end, we use a traffic schedule of the station in order to solve the problem on searching for the time interval having the following two properties. First, during this time interval, all track sections that are necessary to be repaired are vacant simultaneously. Second, this time interval has the maximum length. In addition, we solve two problems to determine the time interval having length that is not less than the length of the specified time interval in the following two cases. First, the desired time interval has the minimum number of occupied track sections that are necessary to be repaired. Second, the desired time interval has the minimum number of delayed (transferred) passenger/freight trains going through the tracks that are necessary to be repaired. All problems are solved by methods of mixed integer linear programming.
Keywords: track possession, station, schedule, mixed integer linear programming.
Funding agency Grant number
Ministry of Education and Science of the Russian Federation 2.2461.2017/Pch
This paper was performed in a framework of government assignment of the Ministry of Education and Science (project no. 2.2461.2017/Pch).
Received: 30.10.2018
Bibliographic databases:
Document Type: Article
UDC: 519.8
MSC: 90B35, 90C11
Language: English
Citation: A. N. Ignatov, A. V. Naumov, “On time selection for track possession assignment at the railway station”, Vestnik YuUrGU. Ser. Mat. Model. Progr., 12:3 (2019), 5–16
Citation in format AMSBIB
\Bibitem{IgnNau19}
\by A.~N.~Ignatov, A.~V.~Naumov
\paper On time selection for track possession assignment at the railway station
\jour Vestnik YuUrGU. Ser. Mat. Model. Progr.
\yr 2019
\vol 12
\issue 3
\pages 5--16
\mathnet{http://mi.mathnet.ru/vyuru500}
\crossref{https://doi.org/10.14529/mmp190301}
\elib{https://elibrary.ru/item.asp?id=41264999}
Linking options:
  • https://www.mathnet.ru/eng/vyuru500
  • https://www.mathnet.ru/eng/vyuru/v12/i3/p5
  • This publication is cited in the following 4 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles
     
      Contact us:
     Terms of Use  Registration to the website  Logotypes © Steklov Mathematical Institute RAS, 2024