Vestnik Sankt-Peterburgskogo Universiteta. Seriya 10. Prikladnaya Matematika. Informatika. Protsessy Upravleniya
RUS  ENG    JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PACKAGE AMSBIB  
General information
Latest issue
Archive

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Vestnik S.-Petersburg Univ. Ser. 10. Prikl. Mat. Inform. Prots. Upr.:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Vestnik Sankt-Peterburgskogo Universiteta. Seriya 10. Prikladnaya Matematika. Informatika. Protsessy Upravleniya, 2016, Issue 2, Pages 80–86
DOI: https://doi.org/10.21638/11701/spbu10.2016.208
(Mi vspui292)
 

This article is cited in 1 scientific paper (total in 1 paper)

Control processes

The influence of available capacity distribution type and fines on the optimal plan of the available capacity of the hydroelectric power plant

M. A. Budylina, S. V. Sokolovb

a Reshetnev Siberian State Aerospace University, 31, Krasnoyarsky Rabochy pr., 660014, Krasnoyarsk, Russian Federation
b St. Petersburg State University, 7–9, Universitetskaya nab., St. Petersburg, 199034, Russian Federation
Full-text PDF (305 kB) Citations (1)
References:
Abstract: The article deals with the optimal hydroelectric power available capacity planning considering the distribution of available capacity and the penalty for difference between actual and planned available capacity. It is assumed that the available capacity may be characterized by different types of symmetrical distributions, and the penalty can range from 0 to $\infty$ of the difference between actual available capacity and planned. The planned value of the available capacity is determined, which maximizes the financial results of the hydroelectric power plants on the wholesale electricity market. Suggestions were made for available capacity planning optimization. A software package for calculating the optimal plan of available capacity hydroelectric power is developed. Refs 8. Figs 2.
Keywords: wholesale electricity and capacity market, competitive capacity selection, model for determination the optimal plan, hydroelectric power plants.
Received: October 14, 2015
Accepted: February 25, 2016
Bibliographic databases:
Document Type: Article
UDC: 338.984
Language: Russian
Citation: M. A. Budylin, S. V. Sokolov, “The influence of available capacity distribution type and fines on the optimal plan of the available capacity of the hydroelectric power plant”, Vestnik S.-Petersburg Univ. Ser. 10. Prikl. Mat. Inform. Prots. Upr., 2016, no. 2, 80–86
Citation in format AMSBIB
\Bibitem{BudSok16}
\by M.~A.~Budylin, S.~V.~Sokolov
\paper The influence of available capacity distribution type and fines on the optimal plan of the available capacity of the hydroelectric power plant
\jour Vestnik S.-Petersburg Univ. Ser. 10. Prikl. Mat. Inform. Prots. Upr.
\yr 2016
\issue 2
\pages 80--86
\mathnet{http://mi.mathnet.ru/vspui292}
\crossref{https://doi.org/10.21638/11701/spbu10.2016.208}
\elib{https://elibrary.ru/item.asp?id=26415561}
Linking options:
  • https://www.mathnet.ru/eng/vspui292
  • https://www.mathnet.ru/eng/vspui/y2016/i2/p80
  • This publication is cited in the following 1 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles
    Вестник Санкт-Петербургского университета. Серия 10. Прикладная математика. Информатика. Процессы управления
    Statistics & downloads:
    Abstract page:70
    Full-text PDF :8
    References:13
    First page:6
     
      Contact us:
     Terms of Use  Registration to the website  Logotypes © Steklov Mathematical Institute RAS, 2024