Vestnik of Astrakhan State Technical University. Series: Management, Computer Sciences and Informatics
RUS  ENG    JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PACKAGE AMSBIB  
General information
Latest issue
Archive
Impact factor

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Vestn. Astrakhan State Technical Univ. Ser. Management, Computer Sciences and Informatics:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Vestnik of Astrakhan State Technical University. Series: Management, Computer Sciences and Informatics, 2021, Number 3, Pages 105–114
DOI: https://doi.org/10.24143/2072-9502-2021-3-105-114
(Mi vagtu684)
 

This article is cited in 1 scientific paper (total in 1 paper)

SOCIAL AND ECONOMIC SYSTEMS MANAGEMENT

Building up schedules in multiproject design management systems

A. S. Dobrynin, S. M. Kulakov, R. S. Koinov

Siberian State Industrial University, Novokuznetsk, Kemerovo region, Russian Federation
References:
Abstract: The article focuses on the problem of algorithmizing the process of building schedules in various spheres of human activity by using the modern mathematical apparatus, as well as achievements in the field of systems analysis, game theory, and graph theory. Nowadays, there have been analyzed and determined the boundaries of the effective application of many well-known heuristic and metaheuristic algorithms, which have shown good results in practice. However, despite the achievements in the discrete optimization, scheduling and network planning, the new problems of drawing up so-called coordinated schedules in the field of multi-project planning, which take into account the preferences (requests, wishes) of specific schedule executors, are still of practical interest. There have been considered the approaches and main stages of solving the problems of constructing coordinated schedules in multi-project planning, which is relevant for the development of new generation software and tools.
Keywords: building up schedules, multi-project planning, directed graph, multigraph, domain, clustering.
Received: 21.03.2021
Document Type: Article
UDC: 004.051
Language: Russian
Citation: A. S. Dobrynin, S. M. Kulakov, R. S. Koinov, “Building up schedules in multiproject design management systems”, Vestn. Astrakhan State Technical Univ. Ser. Management, Computer Sciences and Informatics, 2021, no. 3, 105–114
Citation in format AMSBIB
\Bibitem{DobKulKoy21}
\by A.~S.~Dobrynin, S.~M.~Kulakov, R.~S.~Koinov
\paper Building up schedules in multiproject design management systems
\jour Vestn. Astrakhan State Technical Univ. Ser. Management, Computer Sciences and Informatics
\yr 2021
\issue 3
\pages 105--114
\mathnet{http://mi.mathnet.ru/vagtu684}
\crossref{https://doi.org/10.24143/2072-9502-2021-3-105-114}
Linking options:
  • https://www.mathnet.ru/eng/vagtu684
  • https://www.mathnet.ru/eng/vagtu/y2021/i3/p105
  • This publication is cited in the following 1 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles
    Вестник Астраханского государственного технического университета. Серия: Управление, вычислительная техника и информатика
    Statistics & downloads:
    Abstract page:61
    Full-text PDF :42
    References:9
     
      Contact us:
     Terms of Use  Registration to the website  Logotypes © Steklov Mathematical Institute RAS, 2024