Upravlenie Bol'shimi Sistemami, 2018, Issue 76, Pages 219–238
DOI: https://doi.org/10.25728/ubs.2018.76.7
(Mi ubs979)
 

This article is cited in 1 scientific paper (total in 1 paper)

Control in Technology and Process Control

Models and management structure of innovative technologies development and implementation. ii. model of the energy efficiency stimulation mechanism and the elements of the project management structure

V. N. Burkova, A. K. Enaleeva, V. Strogonovb

a V.A. Trapeznikov Institute of Control Sciences of RAS
b NIIAS
Full-text PDF (846 kB) Citations (1)
References:
Abstract: The article consists of two parts. We continue a study of the mechanisms for managing the implementation of complex projects that ensure energy efficiency at the second part of the article. We consider a model for stimulating energy efficiency in the sequence of projects in a multi-project structure and propose the optimal mechanism for this model. This mechanism includes a planning procedure, fines for non-compliance with plans, and a reward function for project results. The article consider the functioning of the system as a game of the Center and successively connected agents implementing projects. The strategy of the Center is to choose a mechanism. Agent strategies are messages to the Center for data about their parameters and selection of the project results. Information about the parameters of the agents is necessary to calculate the plans based on the planning procedure. At the same time, agents may report corrupted data. We show that the proposed optimal mechanism encourages agents to provide reliable information and select results that coincide with the plans. Taking into account the results of the study of the mechanisms of project evaluation and budget allocation, discussed in the first part of the article, we propose approaches to forming the structure of the management system for the implementation of complex projects.
Keywords: energy efficiency, funds allocation, incentives, control, management structure, organization.
Funding agency Grant number
Russian Foundation for Basic Research 17-20-05216
Received: April 18, 2018
Published: November 30, 2018
Document Type: Article
UDC: 06.35.51; 73.01.77; 73.01.21
BBC: 65
Language: Russian
Citation: V. N. Burkov, A. K. Enaleev, V. Strogonov, “Models and management structure of innovative technologies development and implementation. ii. model of the energy efficiency stimulation mechanism and the elements of the project management structure”, UBS, 76 (2018), 219–238
Citation in format AMSBIB
\Bibitem{BurEnaStr18}
\by V.~N.~Burkov, A.~K.~Enaleev, V.~Strogonov
\paper Models and management structure of innovative technologies development and implementation. ii. model of the energy efficiency stimulation mechanism and the elements of the project management structure
\jour UBS
\yr 2018
\vol 76
\pages 219--238
\mathnet{http://mi.mathnet.ru/ubs979}
\crossref{https://doi.org/10.25728/ubs.2018.76.7}
Linking options:
  • https://www.mathnet.ru/eng/ubs979
  • https://www.mathnet.ru/eng/ubs/v76/p219
  • This publication is cited in the following 1 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles