|
Ensuring the reliability of the FRC CSC RAS center for collective use
A. A. Zatsarinny, A. I. Garanin, S. A. Denisov Federal Research Center "Computer Science and Control" of the Russian Academy of Sciences, 44-2 Vavilov Str., Moscow 119133, Russian Federation
Abstract:
The reliability of the center for collective use of the FRC CSC RAS is evaluated, which takes into account the reliability indicators of the following system's component: a hybrid high-performance complex, power supply, and air conditioning systems. The analysis of the ways to improve the reliability of the center is carried out. The main conditions for ensuring the reliability of functioning and maintaining the operability of the hardware and hardware-software tools of the collective use center during their operation are formulated. Recommendations are given to ensure high-quality maintenance and repair of equipment.
Keywords:
collective use center, power supply system, air conditioning system, reliability, failure, equivalent circuit for reliability calculation.
Received: 22.12.2020
Citation:
A. A. Zatsarinny, A. I. Garanin, S. A. Denisov, “Ensuring the reliability of the FRC CSC RAS center for collective use”, Sistemy i Sredstva Inform., 31:2 (2021), 26–35
Linking options:
https://www.mathnet.ru/eng/ssi762 https://www.mathnet.ru/eng/ssi/v31/i2/p26
|
|