Sistemy i Sredstva Informatiki [Systems and Means of Informatics]
RUS  ENG    JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PACKAGE AMSBIB  
General information
Latest issue
Archive
Impact factor

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Sistemy i Sredstva Inform.:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Sistemy i Sredstva Informatiki [Systems and Means of Informatics], 2016, Volume 26, Issue 1, Pages 166–181
DOI: https://doi.org/10.14357/08696527160111
(Mi ssi455)
 

This article is cited in 2 scientific papers (total in 2 papers)

Methodology of reliability calculation of international thermonuclear experimental reactor and optimization of risk mitigation actions

G. M. Konovalov

Institution "Project Center ITER" of the Russian Federation National Nuclear Corporation "ROSATOM", 1-3 Kurchatova Sq., Moscow 123182, Russian Federation
References:
Abstract: The article is devoted to one of the most important issues of creation of International Thermonuclear Experimental Reactor (ITER), namely, reliability. The principles of ITER reliability analysis approach which are applicable to the ITER and its subsystems are described. The basis of the reliability increasing is so-called RAMI-analysis (RAMI stands for Reliability, Availability, Maintainability, Inspectability). This analysis covers main aspects of the issue: increasing of availability and reliability, the ability to control, to maintain, to renovate, and so on. The main steps of the RAMI-analysis (functional analysis, calculation of availability and reliability, failure mode effects and criticality analysis, and determination of a list of mitigation actions) are shown on the base of real ITER subsystems. The determination of a list of mitigation actions is closely linked with optimization of possible actions which are focused on decreasing of failure possibility and decreasing of mean time to repair the failed component. A mathematical model allowing automating the selection of the most effective and the least expensive mitigation action process which is coupled with processing of large amounts of information is proposed.
Keywords: ITER; tokamak; large system reliability analysis; mitigation actions; mathematical models of reliability optimization.
Received: 02.12.2015
Bibliographic databases:
Document Type: Article
Language: Russian
Citation: G. M. Konovalov, “Methodology of reliability calculation of international thermonuclear experimental reactor and optimization of risk mitigation actions”, Sistemy i Sredstva Inform., 26:1 (2016), 166–181
Citation in format AMSBIB
\Bibitem{Kon16}
\by G.~M.~Konovalov
\paper Methodology of reliability calculation of international thermonuclear experimental reactor and optimization of risk mitigation actions
\jour Sistemy i Sredstva Inform.
\yr 2016
\vol 26
\issue 1
\pages 166--181
\mathnet{http://mi.mathnet.ru/ssi455}
\crossref{https://doi.org/10.14357/08696527160111}
\elib{https://elibrary.ru/item.asp?id=26095464}
Linking options:
  • https://www.mathnet.ru/eng/ssi455
  • https://www.mathnet.ru/eng/ssi/v26/i1/p166
  • This publication is cited in the following 2 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles
    Системы и средства информатики
    Statistics & downloads:
    Abstract page:216
    Full-text PDF :96
    References:52
     
      Contact us:
     Terms of Use  Registration to the website  Logotypes © Steklov Mathematical Institute RAS, 2024