Avtomatika i Telemekhanika, 1976, Issue 7, Pages 154–158
(Mi at7958)
|
|
|
|
Automated control systems
The scheduling a three-machine job shop problem
A. I. Babushkin, A. L. Bashta, I. S. Belov Kharkiv
Abstract:
As an extension of [1] a schedule is developed for 3-machine job shop problem for which the difference between total elapsed time and minimal time does not exceed $3(3\sqrt{2}+5)\max t_{ij}$. A scheduling algorithm is given.
Received: 22.04.1975
Citation:
A. I. Babushkin, A. L. Bashta, I. S. Belov, “The scheduling a three-machine job shop problem”, Avtomat. i Telemekh., 1976, no. 7, 154–158; Autom. Remote Control, 37:7 (1976), 1109–1113