|
Avtomatika i Telemekhanika, 1986, Issue 6, Pages 135–146
(Mi at6358)
|
|
|
|
This article is cited in 1 scientific paper (total in 1 paper)
Automated control systems
Relationship between on-line process control and local equipment optimization problems in factories using continuous processing technology
V. G. Gaitsgorya, E. L. Itzkovichb, A. A. Pervozvanskiic, L. R. Sorkinc a Dushanbe
b Moscow
c Leningraqd
Abstract:
For a chemical process of several continuous installations and storages of the raw material, semi-products, and products the problem of statically optimal control in many actual cases may be divided into two problems without using iterative decomposition. On the higher level, on-line process control, the loads of the installations are chosen and on the lower level, local static optimization of installations, the operating modes of these installations are determined. This procedure leads to a division of labor between various control levels in an integrated control system.
Received: 30.05.1985
Citation:
V. G. Gaitsgory, E. L. Itzkovich, A. A. Pervozvanskii, L. R. Sorkin, “Relationship between on-line process control and local equipment optimization problems in factories using continuous processing technology”, Avtomat. i Telemekh., 1986, no. 6, 135–146; Autom. Remote Control, 47:6 (1986), 851–860
Linking options:
https://www.mathnet.ru/eng/at6358 https://www.mathnet.ru/eng/at/y1986/i6/p135
|
Statistics & downloads: |
Abstract page: | 123 | Full-text PDF : | 70 |
|