Avtomatika i Telemekhanika, 2008, Issue 1, Pages 171–179
(Mi at599)
|
|
|
|
This article is cited in 2 scientific papers (total in 2 papers)
Control Hardware
Optimal scheduling of continuous production with constrained schedule structure
Yu. M. Tsodikov Institute of Control Sciences, Russian Academy of Sciences, Moscow
Abstract:
The problem of optimal multi-period production scheduling for continuous-discrete production was formulated as that of mixed-integer programming with a special structure of the constraints on the discrete variables. As was shown, this form of taking into consideration the a priori requirements on the schedule enables reduction in the number of possible variants of values of the discrete variables and, thus, simplification of the problem. The results obtained were verified by way of a plant model.
Citation:
Yu. M. Tsodikov, “Optimal scheduling of continuous production with constrained schedule structure”, Avtomat. i Telemekh., 2008, no. 1, 171–179; Autom. Remote Control, 69:1 (2008), 158–165
Linking options:
https://www.mathnet.ru/eng/at599 https://www.mathnet.ru/eng/at/y2008/i1/p171
|
|