|
Avtomatika i Telemekhanika, 1982, Issue 6, Pages 161–170
(Mi at5555)
|
|
|
|
Technical Diagnostics
Planning a test control of systems with constraints on check timetable
G. E. Engibaryan Erevan
Abstract:
Units are tested of a system which operates in a cyclic mode where the time interval scheduled for control in each cycle is strictly fived. Test sets have to he distributed among control intervals so as to the system credibility.
Received: 03.02.1981
Citation:
G. E. Engibaryan, “Planning a test control of systems with constraints on check timetable”, Avtomat. i Telemekh., 1982, no. 6, 161–170; Autom. Remote Control, 43:6 (1982), 834–841
Linking options:
https://www.mathnet.ru/eng/at5555 https://www.mathnet.ru/eng/at/y1982/i6/p161
|
Statistics & downloads: |
Abstract page: | 79 | Full-text PDF : | 39 | First page: | 2 |
|