|
Avtomatika i Telemekhanika, 1987, Issue 4, Pages 75–83
(Mi at4418)
|
|
|
|
Developing Systems
Designing a coordinated industrial structure
M. M. Medetov, R. D. Raimbekov, K. S. Sagyngaliev Alma-Ata
Abstract:
A coordinated manufacturing structure is developed. Conditions are determined under which the structure is epi-coordinated. The relevant theorems are proved. The aggregation models and methods [1] are shown applicable to designing a coordinated manufacturing structure. An example is provided.
Received: 27.01.1986
Citation:
M. M. Medetov, R. D. Raimbekov, K. S. Sagyngaliev, “Designing a coordinated industrial structure”, Avtomat. i Telemekh., 1987, no. 4, 75–83
Linking options:
https://www.mathnet.ru/eng/at4418 https://www.mathnet.ru/eng/at/y1987/i4/p75
|
Statistics & downloads: |
Abstract page: | 89 | Full-text PDF : | 45 | First page: | 2 |
|