Abstract:
Proposed was a reliability model of the network project as a complex technical system where the probability of failure-free execution of an activity (project component) was used as the quantitative index of its reliability, and the resulting guaranteed lower estimate of the project, as its reliability index. This approach underlies the formulation of the problem of scheduling not only under resource constraints, but also with regard for the project reliability index. Consideration was given to minimization of the project execution time (main criterion) in terms of the constrained cost and estimate of the project reliability index, as well as in terms the cost in the determinate network model of the project (second criterion) where project reliability satisfies the guaranteed lower bound both for the OR-network and the special case of the AND-network. This approach enabled formulation of the scheduling problem not only under the resource, but also reliability constraints.
Citation:
V. V. Topka, “Minimization of project time and cost under constrained reliability index in the disjunctive project model”, Avtomat. i Telemekh., 2012, no. 7, 78–88; Autom. Remote Control, 73:7 (2012), 1173–1180
\Bibitem{Top12}
\by V.~V.~Topka
\paper Minimization of project time and cost under constrained reliability index in the disjunctive project model
\jour Avtomat. i Telemekh.
\yr 2012
\issue 7
\pages 78--88
\mathnet{http://mi.mathnet.ru/at4040}
\transl
\jour Autom. Remote Control
\yr 2012
\vol 73
\issue 7
\pages 1173--1180
\crossref{https://doi.org/10.1134/S0005117912070077}
\isi{https://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=Publons&SrcAuth=Publons_CEL&DestLinkType=FullRecord&DestApp=WOS_CPL&KeyUT=000306332500007}
\scopus{https://www.scopus.com/record/display.url?origin=inward&eid=2-s2.0-84864572590}
Linking options:
https://www.mathnet.ru/eng/at4040
https://www.mathnet.ru/eng/at/y2012/i7/p78
This publication is cited in the following 2 articles:
V.V. Topka, A.D. Tsvirkun, 2019 Twelfth International Conference “Management of large-scale system development” (MLSD), 2019, 1
Voropaev V.I., Gelrud Ya.D., “Matematicheskie modeli proektnogo upravleniya dlya zakazchika”, Upravlenie proektami i programmami, 2013, no. 1, 18–29