|
Avtomatika i Telemekhanika, 2012, Issue 3, Pages 107–116
(Mi at3781)
|
|
|
|
This article is cited in 6 scientific papers (total in 6 papers)
Applications of Mathematical Programming
On scheduling credited projects
E. A. Martynovaa, V. V. Servakhb a Omsk State University, Omsk, Russia
b Omsk Branch of Sobolev Institute of Mathematics, Siberian Branch of the Russian Academy of Sciences, Omsk, Russia
Abstract:
Consideration was given to scheduling investment projects with regard for possible use of credits. The net reduced profit was used as the optimization criterion. The problem was studied, a mathematical model constructed, an algorithm to solve it was suggested, and a polynomially solvable case was specified.
Citation:
E. A. Martynova, V. V. Servakh, “On scheduling credited projects”, Avtomat. i Telemekh., 2012, no. 3, 107–116; Autom. Remote Control, 73:3 (2012), 508–516
Linking options:
https://www.mathnet.ru/eng/at3781 https://www.mathnet.ru/eng/at/y2012/i3/p107
|
|