Avtomatika i Telemekhanika, 2004, Issue 12, Pages 144–152
(Mi at1680)
|
|
|
|
Control in Social Economic Systems
Geometrical Method of Scheduling in Project Management
I. V. Burkovaa, V. N. Kolpachevb, A. M. Potapenkob a Institute of Control Sciences, Russian Academy of Sciences
b Voronezh State Academy of Building and Architecture
Abstract:
Consideration was given to scheduling by the criterion for uniform use of resources. It was assumed that each job is executed by a unit resource. Two types of inter-job dependences were studied: “finish-finish” (one job cannot be completed until the other is completed) and “finish-start” (one job cannot be started until the other is not completed). To solve the problem, a geometrical method reducing solution to determining the shortest trajectory in a domain constructed from the network graph was proposed.
Citation:
I. V. Burkova, V. N. Kolpachev, A. M. Potapenko, “Geometrical Method of Scheduling in Project Management”, Avtomat. i Telemekh., 2004, no. 12, 144–152; Autom. Remote Control, 65:12 (2004), 1991–1997
Linking options:
https://www.mathnet.ru/eng/at1680 https://www.mathnet.ru/eng/at/y2004/i12/p144
|
Statistics & downloads: |
Abstract page: | 159 | Full-text PDF : | 60 | References: | 35 | First page: | 2 |
|