Avtomatika i Telemekhanika
RUS  ENG    JOURNALS   PEOPLE   ORGANISATIONS   CONFERENCES   SEMINARS   VIDEO LIBRARY   PACKAGE AMSBIB  
General information
Latest issue
Archive
Impact factor
Guidelines for authors
Submit a manuscript

Search papers
Search references

RSS
Latest issue
Current issues
Archive issues
What is RSS



Avtomat. i Telemekh.:
Year:
Volume:
Issue:
Page:
Find






Personal entry:
Login:
Password:
Save password
Enter
Forgotten password?
Register


Avtomatika i Telemekhanika, 2021, Issue 3, Pages 138–148
DOI: https://doi.org/10.31857/S0005231021030089
(Mi at15423)
 

This article is cited in 2 scientific papers (total in 2 papers)

Control in Technical Systems

Synchronizing the operation of workshops in custom production

A. A. Saratov

Interactive Computer-Aided Design Systems, LLC, Tula, 300028 Russia
References:
Abstract: The article describes the SAPFORD-based methodology for reconciling and restructuring the schedules of workshops and sections in the event of failures in the work of production and supply services. An efficient method is proposed for constructing a unified production schedule for a plant, optimized by the criterion of minimizing costs associated with servicing work in progress and penalties for delays in order fulfillment. The task of planning custom-made production is decomposed into subtasks of distributing work to workplaces with specified parameters within acceptable time frames. For each work, the target function of the dependence of the increase in the production price on the amount of delay or premature execution of the work is set and the time of its execution is calculated for which the delivery date of the product is not violated and the “idling” time of the part before the operation starts is minimal. The criteria for subtasks are coordinated by the method of mutual penalties, the essence of which is that the competing jobs in the queues penalize each other with increments of their estimates when letting the competitor take the lead. The first in line is the work with the smallest sum of its own criteria and penalties for delaying competitors. If there are production delays in one shop, the estimates of delayed orders are recalculated and the work in other shops is reordered. The results of the recalculation of the shop operation plans are reflected in the shop nomenclatures of priority works. An example of the solution is given.
Keywords: production schedule, method of mutual penalties, SAPFORD system.
Presented by the member of Editorial Board: A. A. Lazarev

Received: 20.02.2020
Revised: 28.08.2020
Accepted: 10.09.2020
English version:
Automation and Remote Control, 2021, Volume 82, Issue 3, Pages 481–489
DOI: https://doi.org/10.1134/S0005117921030085
Bibliographic databases:
Document Type: Article
Language: Russian
Citation: A. A. Saratov, “Synchronizing the operation of workshops in custom production”, Avtomat. i Telemekh., 2021, no. 3, 138–148; Autom. Remote Control, 82:3 (2021), 481–489
Citation in format AMSBIB
\Bibitem{Sar21}
\by A.~A.~Saratov
\paper Synchronizing the operation of workshops in custom production
\jour Avtomat. i Telemekh.
\yr 2021
\issue 3
\pages 138--148
\mathnet{http://mi.mathnet.ru/at15423}
\crossref{https://doi.org/10.31857/S0005231021030089}
\elib{https://elibrary.ru/item.asp?id=46763388}
\transl
\jour Autom. Remote Control
\yr 2021
\vol 82
\issue 3
\pages 481--489
\crossref{https://doi.org/10.1134/S0005117921030085}
\isi{https://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=Publons&SrcAuth=Publons_CEL&DestLinkType=FullRecord&DestApp=WOS_CPL&KeyUT=000631027300008}
\scopus{https://www.scopus.com/record/display.url?origin=inward&eid=2-s2.0-85102919097}
Linking options:
  • https://www.mathnet.ru/eng/at15423
  • https://www.mathnet.ru/eng/at/y2021/i3/p138
  • This publication is cited in the following 2 articles:
    Citing articles in Google Scholar: Russian citations, English citations
    Related articles in Google Scholar: Russian articles, English articles
    Avtomatika i Telemekhanika
    Statistics & downloads:
    Abstract page:87
    Full-text PDF :13
    References:14
    First page:5
     
      Contact us:
     Terms of Use  Registration to the website  Logotypes © Steklov Mathematical Institute RAS, 2024